Tuesday, November 15, 2005

Looking back before the Oct show

Frantically before the October show went up, I had to build a moveable wall to section off the gallery space. This proved invaluable because I could then store glass and frames inside the hollow wall. But all this became very time consuming. It took me 3 days to build the wall and about $80 in materials.

There is more to getting a gallery ready for a show

than I ever realized. Aside from

getting the gallery space presentable, I still had to revamp the living space which will also affect exhibits. After all, the bathroom and kitchen area will be used during gallery openings. So these areas have to look artistic and polished.

No comments: